Traffic Automation System
System Description
Traffic automation system integrates many sub-systems seamlessly, making information shared and forming an organic whole. This system can monitor and control the running status of electromechanical equipment and the passenger transport situation and related sub-systems uniformly, thus providing decision-making basis for the train’s economical operation, reducing consumption, increasing profits, enhancing efficiency, improving passenger service’s quality, and finally helping the Operator to achieve a scientific and automatic decision management.
System Structure and Configuration
Traffic automation system has integrated electric power SCADA, signal system ATC, environment abd equipment monitoring system FAS, telecommunication network, station equipments management, operation and maintenance system MMS to be a large-scale SCADA system.
System Advantages
System Fcunctions
System hardware is featured by high reliability, high maintainability and high availability; System software has features of strong stability, high fault-tolerance capability and good openness;
The system can inspect and optimize energy consumption, achieving environmental protection and energy conservation.
Engineering case
Electric Utilities
-
End-User: INSTITUTO COSTARRICENSE DE ELECTRICIDAD Background:CHINT T&D has been providing power power transformers to Costa Rican national electricity and telecommunications services provider--Instituto Costarricense de Electricidad. Products Used: 14 U
-
End User:Electric Networks of Armenia Where:Yerevan, Armenia Products Used: In the reconstruction of the national grid projects of Armenia, the 110kv circuit breakers and disconnectors provided by Chint were used in its 17 Substations across the country
-
End User: Enersis S.A. Where: S/E Curacavi & Esco-Elecmetal Background: Enersis is one of the main privately owned multinational electric power corporations in Latin America. It currently holds direct and indirect participation in electric power generat
-
Client: TATA Power Company Limited Background: Chint signed a contract with TATA Power Company Limited for supply 4 Nos. of 110KV 90MVA Power transformers, and CHINT become the first and the only Chinese Power transformer manufacturer to become the appro
-
End User: SONABEL Where: interconnexion Bobo Dioulasso - Ouagadougou in Burkina Faso Background: CHINT cooperated with one of world's largest engineering company Eiffage Energie to build the largest national utility network project in Burkina Faso. Pr
-
End User: CELEC.EP-Ecuador Where: Milagro S/E, Milagro City, Ecuador Background: Since 2008, Chint established strong cooperation relationship with Ecuadorian National Electric Grid Company--CELEC.EP-TRANSELECTRIC. Produts Used: 4 units 230KV 225MVA, 1
-
Owner: National Transmission and Despatch Company (NTDC) Work Scope: Design, Supply, Installation, Testing & Commissioning of 220kV AIS Rohri Station; 220kV Shikarpur Substation Expansion Location: Rohri, Pakistan
-
Owner: Societe National d'Electricite Zaire (SNEL) & Shituru Mining Corporation Work Scope: Design, Supply, Installation, Testing & Commissioning of 220kV SMCO Substation and 220kV SMCO-RC Transmission Line Location: Likasi, D.R. Congo
-
Time: 2008 Where: Saudi Arabia Background: After a series of comprehensive and rigorous audits, Chint now is a certifatcated supplier for SEC and has won some major projects of SEC. Products Used: MCCB NM1